Mont-Fréjus Tunnel à Fourneaux en Savoie

Savoie

Mont-Fréjus Tunnel

    640 Route de Bardonnèche
    73500 Fourneaux
Tunnel du Mont-Fréjus
Tunnel du Mont-Fréjus
Tunnel du Mont-Fréjus
Tunnel du Mont-Fréjus
Tunnel du Mont-Fréjus
Tunnel du Mont-Fréjus
Tunnel du Mont-Fréjus
Tunnel du Mont-Fréjus
Tunnel du Mont-Fréjus
Tunnel du Mont-Fréjus
Tunnel du Mont-Fréjus
Tunnel du Mont-Fréjus
Crédit photo : Florian Pépellin - Sous licence Creative Commons

Timeline

Antiquité
Haut Moyen Âge
Moyen Âge central
Bas Moyen Âge
Renaissance
Temps modernes
Révolution/Empire
XIXe siècle
Époque contemporaine
0
100
…
1800
1900
2000
17-19 septembre 1871
Inauguration
1832
Initial project
31 août 1857
Start of work
1860
Annexation of the Savoy
25 décembre 1870
Junction of galleries
1915
Electricity
12 juillet 1980
Opening of road tunnel
Aujourd'hui
Aujourd'hui

Heritage classified

The first entry: registration by order of 27 March 1926

Key figures

Giuseppe Francesco Medail - Project Initiator Proposed the tunnel in 1832.
Luigi Des Ambrois - Minister Piedmontese Released the project in 1852.
Germain Sommeiller - Chief Engineer Directed the work on Savoyard side.
Quintino Sella - Mining engineer Solved the tunnel ventilation.
Victor-Emmanuel II - King of Piedmont-Sardany Ordered the beginning of the work.
Napoléon III - French Emperor Commanded the Mont-Cenis railway.

Origin and history

The 13.6 km long Fréjus railway tunnel was built between 1857 and 1870 to connect Modane (France) to Bardonnèche (Italy). Initiated by Giuseppe Medail in 1832, the project was taken over in 1852 by Luigi Des Ambrois under King Carlo Alberto, with studies for a Turin-Chambery line. The works, launched in 1857 with a budget of 40 million lire, were carried out despite technical and political challenges, such as the annexation of Savoy to France in 1860.

The construction involved 4,000 workers, resulting in 48 deaths, including 18 during a cholera epidemic in 1864. Germain Sommeiller, Savoyard engineer, innovative with a hydraulic ram, supervised the work on the French side. A temporary railway (Mont-Cenis railway) was built in 1868 to make up for delays, while Quintino Sella solved ventilation problems. The tunnel, inaugurated in 1871, became the longest in the world until 1882.

A symbol of Franco-Italian cooperation, the tunnel was electrified in 1915 and was used for the transport of vehicles before the opening of the road tunnel in 1980. Today it hosts passenger trains (such as Paris-Milan) and goods, notably via the Alpine railway motorway. Its straight line of 12.2 km was extended to 13.6 km after work in 1881 and post-Second World War repairs.

The initial project of Medail, though visionary, was realized thanks to the perseverance of Des Ambrois and the joint funding of Franco-Pedmontese. The junction of the galleries in 1870 marked a technical feat, despite political tensions and a final cost of 70 million lire. The tunnel, classified as Historical Monument in 1926 for its entry, remains a major testimony of 19th century engineering.

Its economic role was crucial, facilitating transalpine exchanges and reducing travel times. The automobile shuttle, active from 1953 to 1980, illustrates its adaptation to modern needs. Today, it embodies both an industrial heritage and a vital infrastructure for European connections, while recalling the human and technical challenges of its construction.